In accordance with the Environmental Impact Assessment Law of the People’s Republic of China and the Measures for Public Participation in Environmental Impact Assessment (Order No.4 of the Ministry of Ecology and Environment), the first public disclosure of the Environmental Impact Assessment (EIA) for the Qidong Base Project for Large-Scale Cryogenic and High-End Intelligent Offshore Equipment (Onshore Section) undertaken by FORTUNE Off-shore&Marine Engineering (Jiangsu) Co., Ltd., is hereby announced as follows:
I. Project Overview
Project Name: Qidong Base Project for Large-Scale Cryogenic and High-End Intelligent Offshore Equipment (Onshore Section)
Project Owner: FORTUNE Off-shore&Marine Engineering (Jiangsu) Co., Ltd.
Project Type: New Construction
Project Location: East Port Area of the Enclosed Harbor Basin, Lvsi Port Economic Development Zone, Qidong City, Nantong, Jiangsu Province, China
Project Description: With a total investment of RMB 2.2billion, the project covers a planned land area of approximately 469.6mu (about 313,000m²) and a total construction area of approximately 157,000m².
The project includes the construction of office buildings, integrated service buildings, manufacturing workshops, raw material warehouses, bonded warehouses, and other supporting facilities.
Major production materials include carbon steel sections, carbon steel plates, stainless steel plates, electrical and instrumentation components, etc.
Upon completion, the project will establish an integrated industrial chain covering R&D and engineering design, core component manufacturing, modular assembly, testing, and delivery, with an annual production capacity of:
50,000tons of onshore natural gas and offshore engineering modules
50,000tons of ultra-large storage tanks and pressure vessels
20,000tons of ultra-large air separation cold boxes
II. Project Owner and Contact Information
Project Owner:FORTUNE Off-shore&Marine Engineering (Jiangsu) Co., Ltd.
Address: East Port Area of the Enclosed Harbor Basin, Lvsi Port Economic Development Zone, Qidong City, Nantong, Jiangsu Province, China
Contact Person: Mr. Hou
Email: houjunjie@fortune-gas.com
Tel: +86 158 5122 0520
III. EIA Consulting Organization
EIA Consultant: Nanjing Guohuan Technology Co., Ltd.
Address: Block B-02, No.2 Hongshan South Road, Xuanwu District, Nanjing, Jiangsu Province, China
Contact Person: Mr. Wei
Tel: +86 181 5169 4512
IV. Link to Public Comment Form
The public comment form is available at:
http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/W020181024369122449069.docx
V. Methods and Channels for Submitting Public Comments
During the preparation of the draft Environmental Impact Assessment Report, members of the public may submit comments and suggestions related to the Environmental Impact Assessment to the Project Owner via letter, email, public participation questionnaire, or other appropriate means.
To facilitate follow-up communication when necessary, contributors are kindly requested to provide the date of submission, their real name, and contact information.
FORTUNE Off-shore&Marine Engineering (Jiangsu) Co., Ltd.
April 21, 2026