Fortune has successfully delivered a state-of-the-art LNG facility with a daily processing capacity of 350TPD. The project combines purification, liquefaction, regasification, and large-scale storage into one integrated solution, setting new standards for efficiency, reliability, and sustainability.
�� High-performance purification – Advanced amine-based acid gas removal, independent dehydration and heavy hydrocarbon units, with automated temperature control for reliable operations.
�� Cutting-edge liquefaction – Siemens two-stage centrifugal refrigerant compressors with integrated plate-fin exchangers, capable of pressurized restart with zero refrigerant loss.
�� Sustainability in action – Energy recovery reduces power consumption; treated wastewater is fully recycled; flash gas and BOG fuel a smart energy plant for cogeneration of power and steam.
�� Safe and flexible storage – A 10,500 m³ stainless steel full containment LNG tank with dual emergency pressurization systems ensures operational safety and grid stability.
This milestone project highlights Fortune’s expertise in delivering innovative cryogenic solutions that support the global transition to cleaner energy.